Equipment and Facilities

You are here

Machinery and Equipment

Power

(hp)

Year of manufacture

ZJ70

Drilling Rig

2 000

2012

ZJ40/2250CZ Truck-mounted Drilling Rig 

1 200

2012

XJ650 Workover Rig

650

2012

XJ550 Workover Rig

550

2012

А60/80

Workover Rig

330

2008 – 2011

MK30Т coiled tubing unit

400

2011

URAN-20.21 coiled tubing unit

330

2009

Fracturing Fleet

3 x 2 000

2008

 

.Operation results on oil fields in Azerbaijan, Bulgaria, China, Cuba, Poland, Russia, Syria, Turkmenistan and Ukraine have shown that after the Company’s technologies application the oil production increases from 2 to 5 times and even more. After well workover the duration of well’s operation at increased level of yield is from 6 months to 2 years.

To find more details about the results of the technologies application, please see “Results” here or in the left menu.