From November 01st to 30th, 2024 in Tianjin (the People's Republic of China), a team of specialists from Yug-Neftegaz Private Limited accepted the ZJ-70 DB drilling rig with a derrick load capacity of 450 tons at the DFXK plant. This drilling rig is designed for drilling oil wells under contract No. T5-8-397 with the State Concern "Turkmennebit".